user stories
[staff/due1/sed-hs15-srs-purple.git] / src / site / apt / eval / s4.apt
CommitLineData
73eb5808
ED
1 -------------
2 Deliverable 4
3 -------------
4 Eric Dubuis
5 -------------
6 January 11, 2015
7
8
9Deliverable 4
10
11* Introduction
12
13 This document describes the tasks to be performed for, and the constituents
14of the Deliverable 4. Such a document would usually not exist in a real
15project documentation. (Similar information would be found elsewhere, for
16example, in the Iteration Plan document, however.)
17
18 [Note:] Do not edit or modify this document. This document is
19 managed by your lecturer.
20
21
22* Goals
23
24 TBD.
25
26
27* On the System Architecture Document (SAD)
28
29 TBD.
30
31
32* On Package Structure
33
34 A sketch of a possible package structure is given in the
35following UML package diagram.
36
37 TBD.
38
39* On Persistence Mechanisms
40
41 TBD.
42
43
44* Components of this Deliverable
45
46 TBD.
47
48
49* Evaluation
50
51 15 points at most are attributed to this deliverable.
52
53 TBD.
54
55
56
57* Deadline
58
03af3c1e 59 This deliverable is due: See {{{./sprints.html}Sprint Plan}}.
73eb5808
ED
60
61 [Note:] Deadline is Friday evening. However, you can provide
62 your deliverable till the following Sunday evening, 12 pm.